PrintSearch  

Taldybulak Exploration Licence, Kyrgyzstan

NI 43-101 Compliant Mineral Resource Estimate

In April 2008, Orsu completed a National Instrument 43-101 compliant resource estimate for Taldybulak-Talas porphyry.

The resource estimate was calculated at various gold cut-off grades and incorporates all drilling data obtained for the Taldybulak-Talas copper-gold project by Q1 2008. At a 0.30g/t gold cut-off, the Indicated resource is 79Mt @ 0.63g/t Au and 0.17% Cu and the Inferred resources is 163Mt @ 0.58g/t Au and 0.14% Cu (Table 1).
 
Table 1; Taldybulak-Talas Copper-Gold Project, Mineral Resource Estimate
(Lero Gold Corp. - April 2008)

Indicated

Cut-off Au g/t

 Mt Au g/tAu MozCu %Cu MlbAu_eq g/tAu_eq Moz
0.201070.531.830.173880.953.24
0.30790.631.610.173011.072.71
0.40610.721.400.182381.172.27
0.50450.811.180.181811.271.84

Inferred

Cut-off Au g/t

 Mt Au g/tAu MozCu %Cu MlbAu_eq g/tAu_eq Moz
0.202860.433.990.148760.787.18
0.301630.583.030.144920.924.82
0.401150.682.500.133361.013.73
0.50870.752.100.132471.073.00

Note: Au_eq=Au g/t + 2.5x Cu %
Metal equivalent: metallurgical recoveries and net smelter returns are assumed to be 100%.

The resource is based on 20 historical Soviet holes (5,078m) and 34 diamond holes (8,484m) drilled from 2005 through to 2008; a total of 9,534m of surface trenching data was also included in the modelling and interpolation. The mineralisation is located within an east-west trending linear porphyry, with a surface exposure of 1,000m x 400m. The above resource is calculated down to a depth of 500m below surface and is fully supported by drilling; no extrapolation of the resource below the base of the current drilling information was undertaken. The mineralisation remains open to the west and at depth, where an interpreted high-grade core (0.7-0.9g/t Au) was intersected during the 2007 drilling programme.

The resources were calculated within a constrained geological wireframe, limited by external pyrite halo defined by an induced polarization survey and verified by drilling. Post-mineral dykes were modelled and excluded from the reported volume and interpolation run.